General Office of the Ministry of Housing and Urban-rural Development, Specifications for Residential Housing Projects (Draft for Comments)
住房和城乡建设部办公厅住宅项目规范 (征求意见稿)
April 17, 2019 | BY
Susan MokIssued: February 15, 2019 Main contents: A transaction for residential premises shall be based on the interior usable area (2.4.6). Newly…
Issued: February 15, 2019
Main contents: A transaction for residential premises shall be based on the interior usable area (2.4.6).
Newly constructed urban residential premises shall be delivered fully fitted out, i.e. the fixed surfaces of all functional spaces shall be surfaced or painted, the water supply and drainage, heating, ventilation and air conditioning, gas, lighting, power supply and other such systems shall essentially be fully installed and the basic equipment in the kitchen and bathroom shall be fully installed, and satisfy basic use standards (2.3.2).
Residential buildings of at least four stories or newly constructed residential buildings where the residence entrance floor is at least nine meters above the exterior designed ground level shall have elevators installed (7.5.1).
| issued:2019-02-15This premium content is reserved for
China Law & Practice Subscribers.
A Premium Subscription Provides:
- A database of over 3,000 essential documents including key PRC legislation translated into English
- A choice of newsletters to alert you to changes affecting your business including sector specific updates
- Premium access to the mobile optimized site for timely analysis that guides you through China's ever-changing business environment
Already a subscriber? Log In Now